Exmouth Power Station and CNG Filling Station – WA 2006
|
Commencing from the greenfields site and subcontracting to Burns Roe & Worley, Peak Industrial Electrical undertook the installation of all electrical and control systems for the power station. This included the installation of two switch-rooms accommodating HV and LV switchboards, AC and DC power systems, and all protection and control equipment. Peak’s project scope also included site works such as earthing grids and the installation of a lighting protection system with bonding to all structures. Installation also extended to the hazardous-area-classified CNG and LNG gas trains and unloading areas, where Peak installed and supplied all cabling equipment in line with relevant standards and industry best practice. |






