BC Iron Nullagine Iron Ore – Pilbara (WA) 2010
|
Peak Industrial Electrical designed the electrical distribution network and the PLC process control at the project, from the design and procurement stages, through to site installation. This included providing all materials, labour and engineering to deliver a fully designed electrical and PLC process control system to support the Striker 700-tonne per hour crushing plant. The project was constructed on a tight schedule and in a remote location that was subject to extreme heat and periodic flooding throughout the construction period. Despite these challenges, Peak delivered the project on time and on budget. |