Cloudbreak Crushing Unit – Pilbara (WA) 2008

Peak Industrial Electrical undertook the design and construction of a crushing and screening plant adjacent to the already existing main plant at the mine site.

The project scope included a dedicated 3.5MVA power plant; a three-stage crushing circuit; a screen deck; and a radial stacking.

Peak provided and installed a full power and control design for the PLC automated plant incorporating touch screen control and SCADA system. Followed by the supply, installation and commissioning of the 500-tonne per hour plant.