Peak Industrial Electrical
27 Kembla Way, Willeton WA 6155
PO Box 108, Willeton WA 6955

Geraldton Port CBH

Thu, 19 Apr 2018

Peak Industrial Electrical has been awarded the refurbishment works of horizontal storage sheds at CBH Geraldton port project.  This project involves the demolition of existing infrastructure and full design and construct of replacement MCC's, process control, light and power equipment to hazardous area classification.

Awarded Projects Archive